Perrault Farms Harvesting Improvements



This project consisted of constructing a 63'x310' hop kiln building, a 104'x250' hop baling facility, and a 50'x150' equipment cover building. We also installed new siding, a new standing seam roof, and new overhead and man doors on an existing 32'x96' storage building.


After septic system and site utilities were installed, we performed final grading and graveled 222,101 sf with 122,651 sf of that also receiving asphalt.


OWNER:

Perrault Farms, Inc.


LOCATION:

Toppenish, WA


TOTAL SIZE OF PROJECT:

56,470 s/f


PROJECT TYPE:

Agriculture/ Office